Kelowna Bird-Safe Glazing Bylaw Guide for Developers

Environmental Protection British Columbia 3 Minutes Read · published May 26, 2026 Flag of British Columbia

In Kelowna, British Columbia, developers should consider bird-safe glazing early in project design to reduce bird collisions and meet Development Permit conditions. Many design expectations are administered through the citys planning and development permit process; see local Development Permit guidelines for specificity.[1]

Design expectations and where rules apply

Bird-safe glazing expectations are typically applied as conditions on Development Permits for projects in sensitive areas or for proposals that include large expanses of glass. Standards often reference patterning, frits, visible markers, film or angling to make glazing visible to birds. When required, these measures form part of the permit and construction drawings submitted to Planning and Building review.

Early coordination with Planning reduces redesign risk.

Compliance, inspections and common triggers

Compliance is generally confirmed during plan review and site inspections by Building or Planning staff. Common triggers for bird-safe conditions include project location near bird habitat, large glazed façades, and proposals within certain Development Permit Areas.

  • Include glazing details in permit drawings and specifications.
  • Schedule compliance review during Development Permit submission.
  • On-site inspections may verify installed glazing matches approved details.

Penalties & Enforcement

Penalties, escalation and enforcement measures for failure to meet Development Permit conditions or bylaw requirements are handled by City of Kelowna enforcement and the planning/building departments. Specific monetary fine amounts for bird-safe glazing non-compliance are not specified on the cited page; the Development Permit and bylaw framework describe enforcement pathways and authority but do not list line-item fine amounts for this specific measure.[1]

  • Fine amounts: not specified on the cited page.
  • Escalation: first offence, continuing offences and repeat penalties are governed by general bylaw enforcement procedures; specific ranges not specified on the cited page.
  • Non-monetary sanctions: orders to remedy, stop-work or require retrofits; referral to court for non-compliance is possible under municipal enforcement powers.
  • Enforcer: Planning and Building Services and By-law Enforcement administer conditions and complaints; appeals follow municipal notice and appeal processes.
If unsure, confirm permit conditions with Planning before procurement or installation.

Applications & Forms

Bird-safe glazing is most commonly secured via a Development Permit or as a condition of Building Permit approvals. The city does not publish a separate, standalone bird-safe glazing form; requirements are incorporated into DP application materials and building permit submissions. Fees, submission method and exact form names are found on the citys Development Permit and Building Permit pages.[1]

Provide glazing specifications and supplier data sheets with applications.

How to comply - practical action steps

  1. Assess risk: check site context for bird habitat and façade glazing area.
  2. Design: specify bird-friendly patterning, frits, or films meeting recognized spacing guidelines.
  3. Document: include glazing details in Development Permit and Building Permit drawings and specifications.
  4. Install: follow approved details during construction and prepare for inspection.
  5. Remedy: if non-compliant, respond promptly to orders to retrofit or replace glazing.

FAQ

Does Kelowna require bird-safe glazing on new developments?
Kelowna may require bird-safe glazing as a condition of a Development Permit for projects that meet local criteria; specific requirements are set in DP conditions and guidelines rather than a single standalone bylaw item.
How do I demonstrate compliance when applying?
Include manufacturer data sheets, elevation drawings showing patterned or treated glazing, and notes in the Development Permit and Building Permit submissions explaining how the glazing meets the guideline spacing or visibility measures.
Who do I contact to report non-compliance?
Contact By-law Enforcement or Planning and Building Services through the citys official contact pages; official complaint intake and follow-up are managed by those departments.

How-To

  1. Review site context and determine whether a Development Permit is required.
  2. Specify bird-safe glazing measures in design documents following recognized spacing guidelines.
  3. Submit Development Permit and Building Permit applications with glazing details and supplier data sheets.
  4. Coordinate inspections with Planning and Building to confirm installed glazing matches approved details.
  5. If an order is issued, prepare and submit a corrective plan and timetable to the enforcing department.

Key Takeaways

  • Integrate bird-safe glazing into design documents early to avoid costly retrofits.
  • Compliance is typically secured via Development Permits and Building Permit reviews.
  • Contact Planning or By-law Enforcement for clarification before construction.

Help and Support / Resources


  1. [1] City of Kelowna  Development Permits and guidelines